Project

Finch West Bridge

Supply, fabricate and install a 300-ton bridge in Toronto for Metrolinx. We fabricated the Welded Wide Flange (WWF) main girder beams that’s spanned over 100’. All the structural steel infill was processed at our facility with a 12”x12” doulas fir wood road decking on top. GPS scanning allowed for all steel to fit sequentially during installation. Specification: CSA S6 Canadian Highway Bridge code.

TESTIMONIALS

We found Burkebro to be efficient, organized and very safety orientated on our projects. From documentation to the workers actions on site, it is apparent that Burkebro embraces a safety culture.

Steve Martin

SouthlandCanada, H&S Manager

Burkebro is one of the most reliable and professional companies I ever had in my projects. They always exceed our expectations and are always looking on ways to assist us and the client. They are one of my first calls to any project. I strongly recommend Burkebro.

Adrian Maciel

Graham, Project Director

I have known the Burke brothers for almost 10 years. During that time, I have performed Welding Engineering functions for their company as well as other Quality related activities. It has been an absolute pleasure working with them, Not only are the brothers hardworking, but this translates down to the work ethic of their employees and is reflected in the quality of the product that leaves their shop. Their quality is second to none<.

Jamed Eden P. Eng

Welding Engineer

CONTACT

SUSTAINABLE, RELIABLE, EXPERIENCED.